After Purchase
& Installation
The flooring and window fashions professionals
assigned to your home project are experts in installing all product
types available at Braid Flooring ...and Window Fashions. To help
prepare you and your home for an installation, we ask that you
review the following recommendations to ensure that the installation
crew can complete the project in a timely and organized manner.
Flooring
1. Please vacuum or sweep your current flooring to minimize existing
dirt and provide the installation crew with a cleaner surface
with which to work.
2. Maintain normal room temperature at least 24 hours prior to
the installation all the way through until the day following the
installation.
3. Please remove any breakable items from countertops, cabinets
and other areas that may be at risk of being damaged during the
installation. Also, to protect all pictures, wall hangings and
drapery, please remove them from your room.
4. Please clean out all closets and storage areas.
5. Please make note of any hidden wiring, such as TV, phone, cable
and alarms or any hidden pipelines.
During your installation, your Design Consultant
will be in contact with you to ensure that the installation proceeds
as scheduled and to answer any questions you may have arising
from the installation.
Window Coverings
1. If possible remove any existing blinds and draperies, including
any hardware before the installer arrives.
2. Please move any furniture, plants and décor accessories
away from the windows.
3. This is also a good time to clean the windows.